The newest post is always on top. If you missed a post, click under the "Archives" heading in the lefthand column. Your comments are welcome, but they are moderated. Just click on the "Feedback" link under the post you want to talk about. If you want to ask Robbie a question, just e-mail him using the "Ask Robbie" link in the righthand column. He'll answer your question via the blog.

More

A Small Setback

Well, we're missing our target opening date of June 15 because we had a snafu with the sign installation. Originally scheduled for May 15, it's been pushed back to mid-June because the permit to close down a lane of traffic didn't go through as expected. There's still a chance that we'll pull everything together at the last second for an opening this month.
 
Everything else is going well with the final installations in the building. The elevator's in place; as soon as we get electricity in the building, we'll be able to use it to move furniture onto the second floor. Most of the first floor furniture is inside the building. The partitions that go in between the manicure tables are in place. We're saving space in the back of the salon for two pedicure thrones (we originally thought we'd fit four in the first floor, but it would really be too tight, especially if a client wants a manicure and pedicure at the same time). We'll have portable tubs that can be pulled up to the manicure stations, as well as a third "VIP" pedicure station in a room upstairs. The waterwalls are installed, and our upstairs patio is full of thriving plants.
 
I started a "June 2008 Photo Gallery" to show off some of the latest construction photos.
Print | posted on Friday, June 06, 2008 4:27 PM

Comments

No comments posted yet.

Add A Comment

Title   
Name 
Email (never displayed) 
Url 
Comments   
Please add 4 and 3 and type the answer here: